Open issues
0 overdue
Reporting
Choose, filter, and compare issue, control-failure, root-cause, and entity-weakness trends. All figures derive from seed records as of the plan date.
Open issues
0 overdue
Closed (6 mo)
to plan date
Recurring open
repeat findings
Control fail rate
0%
latest quarter
Root causes
6
active categories
Ranked by the mean of control-weakness and issue-pressure scoring factors.
Averages the latest test result across every linked control — fail 100, never tested 70, partial 60, pass 0 — weighting key controls double. A control with no test on record counts 50. An entity with no linked controls at all scores 60, because missing assurance is a gap rather than a clean result.
Example: Two linked controls — a key control that failed (100 x 2) and a non-key control that passed (0 x 1) — score (200 + 0) / 3 = 66.7, rounded to 67.
Adds up points across every linked issue. An open issue scores by severity (critical 40, high 25, moderate 12, low 5), plus 8 if it is past its due date and 6 if it is a repeat finding. An issue closed within the last year still carries a quarter of its severity points as residual signal; anything closed longer ago counts nothing. The total is capped at 100.
Example: One open CRITICAL issue that is overdue and a repeat finding scores 40 + 8 + 6 = 54. Add a HIGH issue closed three months ago (25 x 0.25 = 6.25) and the factor reaches 60.
| # | Entity | Domains | Control weakness | Issue pressure | Composite | Driver |
|---|---|---|---|---|---|---|
| 1 |
| Records Retention Programprogram |
| INTEGRATED |
| 100 |
| 18 |
| 59 |
| 1 of 1 linked control(s) failed or partial on latest test. Key controls weighted double. |
| 2 | Customer Contact Centerbusiness unit | OPS | 60 | 18 | 39 | 1 of 1 linked control(s) failed or partial on latest test. Key controls weighted double. |
| 3 | ESG Reporting Initiativeprogram | ADVISORY | 60 | 12 | 36 | No linked controls; assurance over mitigations is unassessed. |
| 4 | Vendor Risk Managementprocess | INTEGRATED | 40 | 12 | 26 | 1 of 2 linked control(s) failed or partial on latest test. Key controls weighted double. |
| 5 | Cloud Email & Collaboration Suiteapplication | IT | 45 | 6 | 26 | 2 of 3 linked control(s) failed or partial on latest test. Key controls weighted double. |
| 6 | ATM Fleet Operationsprocess | OPS, IT | 50 | 1 | 26 | 1 of 3 linked control(s) failed or partial on latest test. Key controls weighted double. |
| 7 | Branch Operations Networkbusiness unit | OPS | 20 | 12 | 16 | 1 of 2 linked control(s) failed or partial on latest test. Key controls weighted double. |
| 8 | HR Information Systemapplication | IT, OPS | 0 | 1 | 1 | 0 of 1 linked control(s) failed or partial on latest test. Key controls weighted double. |