ctl-003
Access is removed within 24 hours of termination or transfer.
- Type
- PREVENTIVE
- Automation
- SEMI_AUTOMATED
- Frequency
- CONTINUOUS
- Owner
- Identity Engineering
Control Design Assessment (CDA)
Procedures evaluating whether the control is designed adequately.
- 1.Obtain and read the JML deprovisioning procedure; confirm it defines the 24-hour SLA and the HR trigger events (termination, transfer) that initiate it.PR.AA-01
- 2.Confirm the deprovisioning workflow is triggered automatically from the HR system of record rather than a manual notification.
- 3.Walk through the JML workflow configuration to confirm access across all in-scope systems is included, not just the primary directory.
Control Operating Effectiveness (COE)
Procedures evaluating whether the control operated over the testing period.
- 1.Select 25 terminations and transfers across the period and confirm access was removed within 24 hours.
- 2.For sampled transfers, confirm access appropriate only to the prior role was removed even where some access correctly carried forward.PR.AA-01
- 3.Confirm any deprovisioning that missed the SLA was identified and escalated.
Linked risks
- Privileged access misusemitigation 2
Framework mappings & latest test
IAM-06IAM-07
Latest test:PARTIAL2026-01-20