ctl-012
Production changes to critical systems require CAB approval.
- Type
- PREVENTIVE
- Automation
- SEMI_AUTOMATED
- Frequency
- CONTINUOUS
- Owner
- Core Systems Engineering
Control Design Assessment (CDA)
Procedures evaluating whether the control is designed adequately.
- 1.Read the change-management procedure and confirm CAB approval is required before production changes to critical systems.PR.PS-06
- 2.Confirm the change tooling enforces an approval gate rather than relying on manual discipline.
Control Operating Effectiveness (COE)
Procedures evaluating whether the control operated over the testing period.
- 1.Select 25 production changes and confirm each has documented CAB approval prior to deployment.
- 2.Confirm emergency changes followed the defined retrospective-approval path.PR.PS-06
- 3.Verify no sampled change was deployed while its approval was still pending or rejected.
Linked risks
- Core platform obsolescencemitigation 2
- Change management failuremitigation 3
Framework mappings & latest test
CCC-01CCC-04
Latest test:PASS2026-03-25