Emergency changes receive retrospective approval within 5 days.
- Type
- DETECTIVE
- Automation
- MANUAL
- Frequency
- WEEKLY
- Owner
- Core Systems Engineering
Control Design Assessment (CDA)
Procedures evaluating whether the control is designed adequately.
- 1.Obtain and read the emergency-change procedure; confirm it defines the 5-day retrospective approval window and the approving authority.PR.PS-06
- 2.Confirm the change tooling flags emergency changes for post-review rather than relying on manual tracking.
Control Operating Effectiveness (COE)
Procedures evaluating whether the control operated over the testing period.
- 1.Select 25 emergency changes from the period and confirm retrospective approval was completed within 5 days.
- 2.Confirm changes without a timely retrospective approval were escalated.PR.PS-06
- 3.Verify no sampled emergency change was later rejected without a documented remediation.
Linked risks
- Core platform obsolescencemitigation 1
- Change management failuremitigation 2
Framework mappings & latest test
CCC-08
Latest test:PARTIAL2026-03-25